Profile of Completed Projects


Power Station and Reticulation Upgrade
  • The installation and upgrade of the LV & HV infrastructure
  • Installation and relocation of generators
  • Replacement of power station InteliGen Classic controllers with InteliGen NT
  • Base box and InteliVision 5 displays
Power Infrastructure Upgrade and Services Extension
  • Installation of new power poles and abc (aerial bundled cable)
  • Reconfiguration of the electrical network
  • New installation of overhead service connections

Water Tank Upgrades
  • The design, supply and erection of the seven water tanks
  • Installation of all associated pipework, gauges and electrical requirements
  • Installation of all safety requirements

Water Treatment Plant Installation
  • installation of Water Treatment Plant unit’s
  • design and installation of the balance of plant including tanks and sheds
  • installation and commissioning of all pipework, electrical and control

Chlorine Gas Installations
  • Design and installation of gas chlorine disinfection systems
  • Installation of pipework, electrical, control and connection to telemetry
  • Installation of all safety requirements

Design, Supply and Construct Water Treatment Plant
  • Design, supply and install Motor Control Centre
  • Design and install control for Balance of Plant
  • Write functional specification
  • Supply and install blend line
  • Supply and install nitrate sensors
  
Warning for Aboriginal and Torres Strait Islander People
This web site may contain images of deceased persons. If you find this offensive please do not enter. If you require images to be removed for cultural reasons please contact us.

LATEST NEWS

Sponsorships


Pilbara Meta Maya Regional Aboriginal Corporation are proud sponsors of:


Quality  Management Policy Environmental Policy Health & Safety Policy

© Copyright Meta Maya. All rights reserved. | Powered by spinoffdigital